Manufacturing Engineer
Production Planner
Quality Control Specialist
Supply Chain Analyst
Operations Manager
Apply lean manufacturing principles to optimize toy car assembly line processes.
Analyze production data to identify bottlenecks and inefficiencies in toy car assembly line operations.
Implement continuous improvement strategies to enhance productivity and reduce waste in toy car manufacturing.
Utilize simulation tools to optimize toy car assembly line layouts and improve overall efficiency.
The programme is available in two duration modes:
Fast track - 1 month
Standard mode - 2 months
The fee for the programme is as follows:
Fast track - 1 month: GBP £140
Standard mode - 2 months: GBP £90
Manufacturing Engineer
Production Planner
Quality Control Specialist
Supply Chain Analyst
Operations Manager
Loading...